Menu ยป

Home / Albums / Dhamma Hall Construction / Winter 2023/2024 [13]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos [3402]

3884 photos

  • IMG 3809
  • IMG 3732
  • IMG 3729
  • IMG 3693
  • IMG 3674
  • IMG 3648
  • IMG 3595
  • 2023-11-29 10.45.17
  • 2023-11-29 12.42.25
  • 2023-11-29 13.12.04
  • IMG 3514
  • IMG 3483
  • IMG 3418
Login
Powered by Piwigo