Menu ยป

Home / Albums / Dhamma Hall Construction / Skylights and flat roof [21]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos (!) [3567]

4063 photos

  • IMG 2486
  • IMG 2478
  • IMG 2446
  • IMG 2746
  • IMG 2474
  • IMG 2480
  • IMG 2481
  • IMG 2482
  • IMG 2483
  • IMG 2500
  • IMG 2764
  • IMG 2510
  • IMG 2450
  • IMG 2515
  • IMG 2518
  • IMG 2521
  • IMG 2723
  • IMG 2452
  • IMG 2522
  • IMG 2527
  • IMG 2528
Login
Powered by Piwigo