Menu ยป

Home / Albums / Dhamma Hall Construction / Roofing, rafters and snow [27]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos [3402]

3884 photos

  • IMG 1309
  • IMG 2077
  • IMG 2079
  • Photo 2023-01-05, 3 27 04 PM
  • Photo 2023-01-05, 3 26 20 PM
  • IMG 2070
  • IMG 2085
  • IMG 2076
  • IMG 2108
  • IMG 2110
  • IMG 2113
  • IMG 2124
  • Photo 2023-01-03, 7 39 54 AM
  • Photo 2023-01-05, 3 26 05 PM
  • Photo 2023-01-05, 3 27 14 PM
  • Photo 2023-01-10, 3 46 08 PM
  • Photo 2023-01-05, 3 28 04 PM
  • Photo 2023-01-06, 1 37 35 PM
  • Photo 2023-01-06, 3 11 01 PM
  • IMG 2094
  • Photo 2023-01-06, 3 11 29 PM
  • Photo 2023-01-06, 8 05 43 AM
  • Photo 2023-01-10, 1 42 36 PM
  • Photo 2023-01-10, 10 56 32 AM
  • Photo 2023-01-10, 3 46 28 PM
  • Photo 2023-01-10, 8 13 48 AM
  • Photo 2023-01-10, 10 56 07 AM
Login
Powered by Piwigo