Menu ยป

Home / Albums / Dhamma Hall Construction / Floor heating [21]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos (!) [3447]

3929 photos

  • IMG 1286
  • IMG 1287
  • IMG 1288
  • IMG 1294
  • IMG 1302
  • IMG 1303
  • IMG 1305
  • IMG 1309
  • IMG 1310
  • IMG 1290
  • IMG 1311
  • IMG 1314
  • IMG 1315
  • IMG 1316
  • IMG 1321
  • IMG 1323
  • IMG 1324
  • IMG 1355
  • IMG 1367
  • IMG 1376
  • IMG 1377
Login
Powered by Piwigo