Menu ยป

Home / Albums / Dhamma Hall Construction / Walls insulation and assembly of timbers [31]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos [3402]

3884 photos

  • IMG 1787
  • IMG 1820
  • IMG 1826
  • IMG 1789
  • IMG 1798
  • IMG 1790
  • IMG 1797
  • IMG 1808
  • IMG 1813
  • IMG 1825
  • IMG 1815
  • IMG 1841
  • IMG 1850
  • IMG 1830
  • IMG 1833
  • IMG 1835
  • IMG 1837
  • IMG 1847
  • IMG 1870
  • IMG 1858
  • IMG 1878
  • IMG 1860
  • IMG 1867
  • IMG 1879
  • IMG 1862
  • IMG 1853
  • IMG 1865
  • IMG 1876
  • IMG 1872
  • IMG 1874
  • IMG 1873
Login
Powered by Piwigo