Dhamma Hall Construction
/
Raising the Main Dhamma Hall walls 2
[27]
slideshow
Albums
Dhamma Hall Construction
[496]
Winter 2023/2024
[13]
Last piece of the roof and septic system
[20]
Metal roof, siding, facilities and more
[20]
Moving the outhouse and general photos
[30]
Skylights and flat roof
[21]
End of winter, spring begins
[19]
Some work in the inside and clearing the roof
[24]
Roofing, rafters and snow
[27]
We continue through winter!
[30]
Walls insulation and assembly of timbers
[31]
Continuing with the roofing
[28]
Blessing the Dhamma Hall
[12]
Roofing and showing the Dhamma Hall to visitors
[16]
Assembling the last rafters
[26]
The timbers arrive!
[36]
Floor heating
[21]
Raising the Main Dhamma Hall walls 2
[27]
Raising the Main Dhamma Hall walls
[18]
Backfilling the foundation
[16]
Foundations and waterproofing
[16]
Timbers
[10]
Footing to foundations
[16]
From clearing to footing
[19]
Event Photos
[3373]