Menu ยป

Home / Albums / Dhamma Hall Construction / End of winter, spring begins [19]

  • slideshow
Albums
  • Dhamma Hall Construction [496]
    • Winter 2023/2024 [13]
    • Last piece of the roof and septic system [20]
    • Metal roof, siding, facilities and more [20]
    • Moving the outhouse and general photos [30]
    • Skylights and flat roof [21]
    • End of winter, spring begins [19]
    • Some work in the inside and clearing the roof [24]
    • Roofing, rafters and snow [27]
    • We continue through winter! [30]
    • Walls insulation and assembly of timbers [31]
    • Continuing with the roofing [28]
    • Blessing the Dhamma Hall [12]
    • Roofing and showing the Dhamma Hall to visitors [16]
    • Assembling the last rafters [26]
    • The timbers arrive! [36]
    • Floor heating [21]
    • Raising the Main Dhamma Hall walls 2 [27]
    • Raising the Main Dhamma Hall walls [18]
    • Backfilling the foundation [16]
    • Foundations and waterproofing [16]
    • Timbers [10]
    • Footing to foundations [16]
    • From clearing to footing [19]
  • Event Photos [3567]

4063 photos

  • IMG 2233
  • Photo 2023-03-09, 10 40 45 AM
  • Photo 2023-03-09, 10 45 59 AM
  • Photo 2023-03-10, 9 14 36 AM
  • Photo 2023-03-10, 12 59 44 PM
  • Photo 2023-03-15, 1 12 31 PM
  • IMG 2410
  • Photo 2023-03-24, 4 09 37 PM
  • Photo 2023-03-25, 8 18 28 PM
  • Photo 2023-03-26, 6 15 55 PM
  • IMG 2385
  • Photo 2023-03-26, 6 16 51 PM
  • Photo 2023-03-27, 3 42 27 PM
  • Photo 2023-03-27, 4 37 57 PM
  • Photo 2023-03-29, 2 00 28 PM
  • Photo 2023-03-29, 2 00 43 PM
  • Photo 2023-03-29, 11 52 45 AM
  • Photo 2023-03-30, 6 30 37 PM
  • IMG 2420
Login
Powered by Piwigo