- Albums
-
-
Dhamma Hall Construction
[496]
- Winter 2023/2024 [13]
- Last piece of the roof and septic system [20]
- Metal roof, siding, facilities and more [20]
- Moving the outhouse and general photos [30]
- Skylights and flat roof [21]
- End of winter, spring begins [19]
- Some work in the inside and clearing the roof [24]
- Roofing, rafters and snow [27]
- We continue through winter! [30]
- Walls insulation and assembly of timbers [31]
- Continuing with the roofing [28]
- Blessing the Dhamma Hall [12]
- Roofing and showing the Dhamma Hall to visitors [16]
- Assembling the last rafters [26]
- The timbers arrive! [36]
- Floor heating [21]
- Raising the Main Dhamma Hall walls 2 [27]
- Raising the Main Dhamma Hall walls [18]
- Backfilling the foundation [16]
- Foundations and waterproofing [16]
- Timbers [10]
- Footing to foundations [16]
- From clearing to footing [19]
- Event Photos [3238]
3720 photos
-
Dhamma Hall Construction
[496]